Recently, Datang Group issued the bidding announcement for unit procurement of 602mw offshore and onshore wind power project, which are as follows:
Datang International Huludao Lianshan 250MW wind power project is located in Liaoning Province. The bidding capacity is 250MW, the single unit capacity is required to be 4MW or above, the impeller diameter is not less than 180m, the hub height is not less than 120m, and mixed discharge is not allowed. Don’t accept it. The delivery time is from March 2023 to October 2023.
Datang South Australia lemen I offshore wind power expansion project is located in Shantou. The bidding capacity of the project is 352mw, the unit capacity is required to be 11mw and above, the impeller diameter is 200m and above, the hub height is 120m and above, and the machine position is delivered. The delivery time is from August 2022 to may 2023.