Tender for Service of Black Start Tech for Three Gorges New Energy Jiangsu Rudong 800MW Offshore Wind Power Project

Conditions:

this project has been approved for construction, construction funds come from the delegate self-raised funds and bank loans.

Tenderee:

Three Gorges New Energy Nantong Co., LTD.,

Tendering agency:

Three Gorges International Tendering Co., LTD.

The project has met the bidding conditions, and now the project is subject to public bidding.

Project Overview:

Jiangsu Rudong 800MW (H6, H10) wind power project of Three Gorges New Energy is located in Huangsha Ocean in the east of Rudong County. The straight-line distance from the offshore center of H6 wind power plant to this project is about 50km, the planned sea area is about 66km2, and the installed capacity is 400MW.

The straight-line distance from the offshore center of H10 Wind Farm to this project is about 63km, the planned sea area is about 66km2, and the installed capacity is 400MW.

The total power of H6, H10 and H8 (300MW, developed by CGN) wind farm is 1100MW, collected at the offshore converter station and sent to the onshore converter station through one ±400kV DC cable. After the inverting of the onshore converter station, there is 500kV AC and it is connected to Jiangsu power grid through one 500kV cable.

Specific content (including but not limited to):

Preparation of feasibility study plan for H6, H10 Black Start Project. Black Start Tech project setting value calculation, Black Start Tech project model simulation, diesel generating cable with 35 kV cable booster test, Turbine connection test, coordination and cooperation services for the turbines and manufacturers.

For further details, please click here