Tender for general contracting of the first batch of the first phase of the rural water environment governance project in Haimen District, Nantong City, China

 

Project Overview:

Changle control sluice demolition and construction, for the clear width of 12m single-hole gate;

Iron-plated ocean bridge sluice demolition and construction, for the clear width of 6m single hole gate;

Building Qinglong Hebei Sluice, with a clear width of 3m;

Hutong Hebei Sluice relocation, a clear width of 6m single hole gate;

Comprehensive treatment of Lixin River (including the treatment of 4.33km of Lixin River, and building 4m wide Lixin Hebei Sluice).

A total of three secondary river channels, and the total length of river channel that requires treatment is 18.961km, and the details are as follows.

The treatment of 13.828km of Hutong River from the south of Haimen River to the Hutong Gate, from the north of Tongqi River to Hutong Hebei Sluice Gate.

The treatment of 2.589km of Donglong River

The treatment of 2.544km of Yunyan River from K13+391, west of Wangzao Bridge  to K16+005, the designed end point of Yunyan River.

Estimated price of the project:

about 175,597,500 yuan

Construction location:

Haimen District

Construction period:

240 days.

The time period for obtaining the bidding documents:

from January 8, 2021 to 9:00 on March 1, 2021

Deadline for bids:

9:00 on March 1, 2021


 

For further details, please refer to here