Fengxian west wastewater treatment plant upgrade and Phase III expansion project

Progress stage: engineering design
Construction period: 2016 – 2017
Major equipment: hoist, pumps, valves, turbine, glass pipes, automation and control systems, pipes, manholes, sludge thickening machine, suction machine, Mixer, submersible pumps, cranes, testing equipment, instruments, meters, analytical instruments, ozone generator. (for reference only)
Project Description:
The project is located 888 Dragon Road, Fengxian District of Shanghai Chemical Industrial Park, the total land area of about 161,340 square meters, including new land of about 11,932 square meters. Sewage treatment plant the total size of 200,000 m3 / d.
The total investment is 350 million yuan.