CGN Houhu Shanwei offshore wind turbine installation project bid Ⅱ. The project plans to install a capacity of 500 MW, 91 sets of 5.5 MW wind turbines.

Project location: Shanwei city and Lufeng city in Guangdong province

Project overview

Bidding scale and planned project duration

Scale: Guangdong Shanwei Houhu 500MW offshore wind power project site is located in the offshore area south of Hudong Town, Lufeng City, Shanwei City. The Houhu site covers an area of about 80km2, the offshore distance of the site center is about 12km, and the water depth is between 23m and 27m. The planned installed capacity is 500MW, and 91 sets of 5.5MW wind power turbines are planned to be arranged.

Content and scope of bidding:

This contract is for the turbine installation project of CGN Shanwei Houhu Offshore Wind Farm Project. The purchase quantity is 10+10. The initial contract quantity is 10 sets, and the other 10 sets are optional.

See Chapter 7 of the bidding documents for specific work contents.

Planned construction period: 184 days.

The time for obtaining the bidding documents: from 10:00 on February 24, 2021 to 17:30 on March 1, 2021

Deadline for submission of tender documents: 9:00 on March 18, 2021